top of page
Search

How can we prototype more?





'I made 5,127 prototypes of my vacuum before I got it right. There were 5,126 failures. But I learned from each one. That’s how I came up with a solution. So I don’t mind failure.'

James Dyson


The manufacturing industry creates detailed prototypes, fully coordinate all aspect of the product and challenge design decisions before commiting to manufacture.


Why does the construction industry still coordinate and make design decisions on site after construction starts?


How can we prototype more during the design stage to eliminate the requirement to design on site?


How can we share this coordinated design info with the construction site?


How can we learn project to project and document what we learn?


Creu Cartref dwelling and apartment types use only 9 room modules that are interchangeable, fully designed and coordinated in our 3d software at design stage.


Would this assist in ensuring that design decisions are not required on site?


Would this make things easier?


Find our more here https://www.creucartref.com/



Further reading:


13 views0 comments
Post: Blog2_Post
bottom of page